Controlling multi-level production in a rolling-schedule environment
Dellaert, Nico; Jeunet, Jully (2003), Controlling multi-level production in a rolling-schedule environment, International Journal of Production Economics, 85, 1, p. 113-121. http://dx.doi.org/10.1016/S0925-5273(03)00091-4
Type
Article accepté pour publication ou publiéDate
2003Journal name
International Journal of Production EconomicsVolume
85Number
1Publisher
Elsevier
Pages
113-121
Publication identifier
Metadata
Show full item recordAbstract (EN)
We consider the multi-level lot-sizing problem in a rolling-schedule environment as it occurs in Material Requirements Planning systems, with no capacity constraints and a time-invariant cost structure. We show that the performance of fixed-horizon methods can be improved drastically in a rolling-schedule environment. We consider several improvement methods, such as the use of discounted costs and implementing a make-to-stock policy for the basic components.Subjects / Keywords
Lot sizing; General product structure; Rolling schedule; Planning systemsRelated items
Showing items related by title and author.
-
Jeunet, Jully; Dellaert, Nico (2005) Article accepté pour publication ou publié
-
Dellaert, Nicolas; Jeunet, Jully (2003) Document de travail / Working paper
-
Dellaert, Nico; Jeunet, Jully (2003) Article accepté pour publication ou publié
-
Jeunet, Jully (2006) Article accepté pour publication ou publié
-
Jonard, Nicolas; Dellaert, Nico; Jeunet, Jully (2000) Article accepté pour publication ou publié