hal.structure.identifier | Laboratoire d'analyse et modélisation de systèmes pour l'aide à la décision [LAMSADE] | |
dc.contributor.author | Shen, Xueying | * |
hal.structure.identifier | autre | |
dc.contributor.author | Focacci, Filippo | * |
hal.structure.identifier | Laboratoire d'analyse et modélisation de systèmes pour l'aide à la décision [LAMSADE] | |
dc.contributor.author | Furini, Fabio | * |
hal.structure.identifier | Laboratoire d'analyse et modélisation de systèmes pour l'aide à la décision [LAMSADE] | |
dc.contributor.author | Gabrel, Virginie | * |
hal.structure.identifier | autre | |
dc.contributor.author | Godard, Daniel | * |
dc.date.accessioned | 2016-02-23T10:45:45Z | |
dc.date.available | 2016-02-23T10:45:45Z | |
dc.date.issued | 2015-02 | |
dc.identifier.uri | https://basepub.dauphine.fr/handle/123456789/15398 | |
dc.language.iso | en | en |
dc.subject | production planning | en |
dc.subject | set-up costs | en |
dc.subject.classificationjel | D.D2.D24 | en |
dc.title | Mathematical models for real-world production planning problems with sequence-dependent set-up costs | en |
dc.type | Communication / Conférence | |
dc.description.abstracten | Production Planning(PP) aims at making production decisions optimizing the Manufactur-ing and Supply Chain performances.Given a limited amount of manufacturing resources, raw materials, and inventory space,PP minimizes the overall manufacturing and supply chain costs while meeting service levelrequirements and obeying operational constraints. In this research we focus on the sequence-dependent set-up costs which occur when we change a product production during manufac-turing. In real-world manufacturing, this cost typically depends on both the predecessor andcurrent production. The set-up costs are also called clean-up costs, changeover costs or start-upcosts (in the literature). These costs are one important part of the production costs for manyreal-world production systems. The set-up costs optimization may dramatically affect the qual-ity of the production plans in terms of machine operational efficiency, cycle time, service leveland inventory turns. Finally, different levels of details are typically taken into considerationwhich largely affect the complexity of the resulting models. In this work, we study a real-worldPP problem with sequence-dependent set-up costs and we propose different formulations withdifferent levels of details of the operational constraints. | en |
dc.identifier.citationpages | 2 | en |
dc.relation.ispartofdate | 2015 | |
dc.identifier.urlsite | http://roadef2015.lsis.org/articles/191.pdf | en |
dc.relation.conftitle | ROADEF 2015 | en |
dc.relation.confdate | 2015-02 | |
dc.relation.confcity | Marseille | en |
dc.relation.confcountry | France | en |
dc.relation.forthcoming | non | en |
dc.description.ssrncandidate | non | en |
dc.description.halcandidate | oui | en |
dc.description.readership | recherche | en |
dc.description.audience | International | en |
dc.relation.Isversionofjnlpeerreviewed | non | |
dc.date.updated | 2016-02-23T10:29:14Z | |
hal.identifier | hal-01277848 | * |
hal.version | 1 | * |
hal.update.action | updateMetadata | * |
hal.update.action | updateFiles | * |
hal.author.function | aut | |
hal.author.function | aut | |
hal.author.function | aut | |
hal.author.function | aut | |
hal.author.function | aut | |